  Projects  
 

 

GAS PLANT COMMISSIONING PROJECTS

Ongoing as at September 2018

    • Mechanical Completion & Pre-commissioning of 200MMSCFD Cryogenic Gas Processing Plant Project for Pan Ocean Oil Corporation (POOC).
    • Spare Parts & Materials Procurement of Ovade Gas Processing Plant Project for Pan Ocean Oil Corporation (POOC).
Completed
    • Provision for QA/QC Inspection Services for 150MMSCFD Oben Gas Plant for SEPLAT Petroleum Development Company

 

OIL FACILITY PROJECTS

Ongoing as at September 2018

    • Well head Upgrade Services with Remote Pressure, Temperature & Flow Data Monitoring Capability at Abura OML 65, Nigeria Petroleum Development Company (NPDC) / Gas Stream Asset Management Limited.
    • Engineering, Procurement, Installation & Commissioning of a 6000BOPD Condensate Stabilization Equipment at Oredo OML 111, Nigeria Petroleum Development Company (NPDC) / Schneider & Schroeder Nigeria Limited.
    • Engineering, Procurement, Construction and Installation of Oily Water Treatment Facility for NPDC at Oziengbe Flow Station, OML 111, Nigeria Petroleum Development Company (NPDC) / Zigma Limited.

 

Completed
    • Procurement of Mechanical & Instrumentation Materials for Izombe Flow Station, Imo State, Addax Petroleum Development Nigeria Limited.
    • Engineering, Procurement, Installation & Commissioning of Mobile Prover Loop for OML 111 Operation, Nigeria Petroleum Development Company (NPDC).
    • Flushing, Intelligent Pigging and Nitrogen Preservation of 10” x 22km Gas Export Pipeline spanning from Oredo Flow Station to POOC Ovade Ogharafe for Nigeria Petroleum Development Company (NPDC).
    • Engineering, Procurement, Construction & Installation of Gas Flow Meters, Flare Purge and Pilot Systems Modification at Oredo EPF & Oziengbe-South Flow Station, Nigeria Petroleum Development Company (NPDC).
    • Engineering, Procurement, Construction, Installation & Commissioning of Gas Flow Meters, Flare Purge, Auto Pilot and Ignition systems Modification at the Existing Oredo Flow Station, Nigeria Petroleum Development Company (NPDC).
    • Engineering, Procurement and Installation of 15nos 5,000psi Adjustable Chokes on Oredo Inlet Manifold, Nigeria Petroleum Development Company (NPDC).
    • Engineering, Procurement, Installation and Commissioning of 5nos 30 Feet Magnetic Level Gauges and Transmitters on Oziengbe and Oredo Crude Oil Tanks, Nigeria Petroleum Development Company (NPDC).
    • Engineering, Procurement, Construction & Commissioning of 10,000BOPD Oredo Early Production Facility (Executed by PPS Inc.)

 

ENGINEERING DESIGN, TECHNICAL AUDITS AND AS-BUILT PROJECTS

Completed

    • Detailed Engineering Design of Oredo Flow Station 100,000 Bbl. Crude Oil Storage Tank for OML 111 Operations for the Nigeria Petroleum Development Company (NPDC).
    • OML 30 Surface Production Facility Audit for Heritage Energy Operational Services Ltd.
    • Technical Evaluation of Chimons LP Gas Terminal Project for United Capital Limited.
    • Engineering & Materials verification for 200MMSCFD Pan Ocean Gas Processing Plant Project.
    • Detailed Engineering Design For Oben FLB EXPANSION, SEPLAT Petroleum Development Company.
    • Engineering Design As-Built for Oben Inlet & Outlet Piping As-Built for SEPLAT Petroleum Development Company.
    • 2D As-Built Drawings (Process, Civil, Mechanical, Electrical, Instrumentation and piping) of Jones Creek Gas Lift Facility for Tonmoor International.
    • 2D As-Built Drawings (Process, Civil, Mechanical, Electrical, Instrumentation and piping) for the Nigeria Petroleum Development Company Old Oredo Flow Station.
    • 2D As-Built Drawings (Process, Civil, Mechanical, Electrical, Instrumentation and piping) for the Nigeria Petroleum Development Company for 10,000 B0PD Early Production Facility.
    • 2D As-Built Drawings (Process, Civil, Mechanical, Electrical, Instrumentation and Piping) for the Nigeria Petroleum Development Company Oziengbe 10,000BOPD Flow Station.
    • 2D As-Built Drawings (Process, Civil, Mechanical, Electrical, Instrumentation and piping) for the Nigeria Petroleum Development Company for 100MMSCFD Integrated Gas Handling Facility.
    • Detailed Engineering Design for the Equipment Relocation in Oben Gas Plant Expansion Project for SEPLAT Petroleum Development Company.

 

PROJECT MANAGEMENT SERVICES

Ongoing as at September 2018

    • Project Management for the Construction of 300 Million Liters Petroleum Product Depot Storage Facility at Ibefun on behalf of Wema Bank Plc.
Completed
    • Project Management for the Construction of a 20 Million Liters Petroleum Product Depot Storage Facility for Bond Global Energy at Ijegun.



Worldwide Experience

  • PPS Inc. has about 20 years of dedicated oil & gas services in the United States. With several locations across the US, PPS has over the years established & implemented proven standards& processes that ensure successful delivery of every project regardless of the size, achieving quality, cost & schedule objectives.

  • Performed Extended Well Testing Program on two HPHT wells. Operations included conducting well control, production testing, and well clean out operations using coil tubing and snubbing. (2002 Anadarko Petroleum, Lost Hills, CA)

  • Provided, installed, and operated production facility to control and process gas and liquids from HPHT well blow out in Lost Hills California. Facilities handled up to 30,000 BPD of 315ºF liquid and 35 MMCFD gas.

    Facility allowed customer to sell gas, while shipping water to injection facilities. Facility was commissioned 7 days after award of contract and was operated for 6 months until a relief well was drilled and the well was killed. (1999 – 2000 Elk Point Resources, CA).

  • Provided and operated early production facilities for multiple well development project. Facilities included separation, gas handling, and data acquisition systems. Facility was designed to handle 5000 BPD liquid and 3.5 MMSCFD gas. (1999 – 2000 Nuevo Energy, Cymeric, CA)

  • Provided and installed emergency relief flare system, used for 6 months while customer was replacing a permanent flare which was damaged. System included flare, scrubber, water seal vessel, purge gas, pilot gas, automatic ignition system, and alarms. (2002 A era Energy,Belridgefield, CA)

  • Provided H2S Treatment Facilities to sweeten group gas gathering line prior to permanent facility installation. Designed to handle 30 MMSCFD with up to 200 PPM H2S.(2001- 2002 Aera Energy, Belridge field, CA).

 

 

 
 